Mandatory building automation (BACS): what the EU buildings directive requires for offices and plants
Under the recast Energy Performance of Buildings Directive, (EU) 2024/1275, non-residential buildings – offices, plants, shops, warehouses – must be equipped with building automation and control systems (BACS) if their heating, air-conditioning or combined ventilation systems have an effective rated output above 290 kW; by 31 December 2029 the threshold drops to 70 kW. We summarise what the system must do, where Hungarian law stands, and how ISO 52120-1 helps with design.
In short
- Who? Non-residential buildings whose heating, air-conditioning or combined ventilation systems exceed 290 kW effective rated output (31 December 2024) or 70 kW (31 December 2029) – where technically and economically feasible. This is Article 13(9) of Directive (EU) 2024/1275.
- What must it do? Continuous energy monitoring and analysis, benchmarking and detection of efficiency losses, vendor-independent communication with other systems, and from 29 May 2026 monitoring of indoor environmental quality (Article 13(10)).
- Lighting: the same buildings also need automatic, zoned lighting controls with occupancy detection: above 290 kW by 31 December 2027, above 70 kW by 31 December 2029 (Article 13(12)).
- Hungary: the decree in force (9/2023 ÉKM) contains the 290 kW obligation with a 1 January 2025 deadline; transposition of Directive 2024/1275 and the 70 kW stage had not appeared in the national legal database (as of 10 November 2026) – in progress, to be verified.
Author: Norbert Madarász
, Managing Director and Partner · Updated: 10 November 2026
What is BACS, and what is a building management system?
Under Article 2 of the directive, a building automation and control system (BACS) comprises all products, software and engineering services that support energy-efficient, economical and safe operation of technical building systems through automatic controls and by making manual management easier.
People often talk about a building management system (BMS): this is the upper, operator level of a BACS, where facility staff see alarms, measured values and energy use. Below it are the automation level (controllers, logic modules) and the field level (sensors, actuators, meters). The directive expects the whole chain: a nice dashboard is not enough without metering and control underneath.
What does Directive (EU) 2024/1275 require?
The recast directive entered into force on 28 May 2024 and repealed Directive 2010/31/EU with effect from 30 May 2026 (Article 36). Member States had to transpose most provisions by 29 May 2026 (Article 35). The BACS rules are in Article 13:
| Requirement | Buildings | Deadline | Where? |
|---|---|---|---|
| BACS installed | non-residential, heating / air-conditioning / combined ventilation effective rated output > 290 kW | 31 December 2024 | Art. 13(9)(a) |
| BACS installed | non-residential, same systems > 70 kW | 31 December 2029 | Art. 13(9)(b) |
| Indoor environmental quality monitoring in the BACS | the buildings above | 29 May 2026 | Art. 13(10)(d) |
| Automatic lighting controls (zoned, occupancy detection) | non-residential > 290 kW | 31 December 2027 | Art. 13(12)(a) |
| Automatic lighting controls | non-residential > 70 kW | 31 December 2029 | Art. 13(12)(b) |
| Electronic monitoring, controls, response to external signals | new and majorly renovated residential buildings | from 29 May 2026 | Art. 13(11) |
Every obligation applies “where technically and economically feasible”; what this means for a given building is decided by national law and the designer’s assessment. Article 23(1), on inspections, describes the effective rating as the sum of the rated output of the heat and cooling generators; the exact calculation follows national rules.
What must the system be capable of?
- Monitoring: continuously monitoring, logging and analysing energy use, and allowing it to be adjusted.
- Benchmarking and alerts: assessing the building’s energy efficiency, detecting efficiency losses in technical building systems, and informing the facility manager about improvement opportunities.
- Interoperability: communication with connected technical building systems and appliances, across different proprietary technologies, devices and manufacturers.
- Indoor environment: from 29 May 2026, monitoring of indoor environmental quality (such as temperature and air quality).
Where does Hungarian law stand?
In Hungary, the BACS obligation is currently in Decree 9/2023 (V. 25.) ÉKM on the energy characteristics of buildings, Annex 1 point 3.7.1. Where technically possible, heating, air-conditioning and combined ventilation systems above 290 kW effective rated output in non-residential buildings had to be equipped by 1 January 2025 with a building automation and control system able to monitor and analyse energy use continuously, assess efficiency and communicate independently of manufacturers.
The decree refers to the transposition of the old Directives 2010/31/EU and (EU) 2018/844. On 10 November 2026 the national legal database (njt.hu) showed the version of 2 November 2023 as current; we found no Hungarian legislation transposing (EU) 2024/1275, the 70 kW stage or the lighting-control obligation. Transposition is therefore in progress, to be verified: for new projects it is sensible to plan for the 2029, 70 kW deadline, because the directive requires it of every Member State.
ISO 52120-1: what level of automation is needed?
The energy impact of automation is described by EN ISO 52120-1:2022, which replaced EN 15232-1:2017. It groups functions (heating, cooling, ventilation, domestic hot water, lighting, shading, technical building management) and the level of automation into efficiency classes A to D; D is non-energy-efficient, A is the highest level. Annex I of the directive names ISO 52120-1 among the key standards for national calculation methods.
In practice the class is not an end in itself: at design stage you decide which functions save the most in that building (for example occupancy-based heating and cooling, demand-controlled ventilation, daylight-linked lighting and shading) and what metering and control they need.
What does a compliant system look like in an office or plant?
- Metering: meters on the main energy users (heating, cooling, ventilation, lighting, process), so that the monitoring and benchmarking required by the directive are possible at all.
- Open protocols: KNX for room automation, lighting and shading; BACnet or Modbus for HVAC plant; linked by gateways. This meets the vendor-independent interoperability requirement.
- Lighting: zoned control with occupancy and daylight sensors, for example with KNX or DALI.
- Indoor environment: temperature, humidity and CO₂ sensors in the rooms, also used for ventilation control.
- Management level: trends, alarms and energy reports for the operator; secure remote access via VPN.
We have built KNX-based room and lighting automation with energy metering in homes and smaller buildings. In larger buildings, HVAC control and the management system are joint work with the mechanical designer and suppliers; we handle the electrical and KNX part, metering and integration.
Building automation in office buildings and hotels: what does a BMS do?
Building automation (BACS) and the building management system (BMS) rest on the same three levels in offices and hotels: room automation, HVAC control and a shared management interface. The difference lies in how the building is used.
| Area | Office building | Hotel |
|---|---|---|
| Rooms | zone heating and cooling, presence-based lighting and shading, meeting-room scenes | guest-room automation: key-card switch, window contact, setback temperature in empty rooms |
| Lighting | DALI or KNX, presence and daylight control, constant light in offices | corridors with presence sensors, common areas on time schedules, scenes in lobby and restaurant |
| Metering | sub-metering per floor or tenant, energy reports | metering split by wing, kitchen and spa |
| Management | alarms, trends and energy reports for the operator | room status for reception, if the hotel software can receive it |
In both building types, DALI lighting control and KNX-based room automation form the field level, and HVAC connects through a BACnet or Modbus gateway. The split of work is the same as above: we handle the electrical and KNX/DALI part, metering and integration, and develop HVAC control together with the mechanical designer and suppliers.
Steps: from survey to handover
- Survey adding up the output of existing heating, cooling and ventilation systems, listing existing controls and meters.
- Target and level defining the mandatory minimum (Article 13(10)) and the economically justified ISO 52120-1 level.
- Design metering points, protocols, network and IT security, operator interface.
- Installation and commissioning cabling, devices, programming, integration, functional tests.
- Handover documentation, operator training, handing over project files and passwords to the operator.
Related: Low-voltage systems · KNX smart home and building automation · Electrical design · Energy metering with submeters
Frequently asked questions
Who must install building automation (BACS)?
Under Article 13(9) of Directive (EU) 2024/1275, non-residential buildings whose heating, air-conditioning or combined ventilation systems exceed 290 kW effective rated output (31 December 2024) or 70 kW (31 December 2029), where technically and economically feasible.
What do 290 kW and 70 kW refer to?
The effective rated output of heating, air-conditioning and combined ventilation systems. Article 23, on inspections, describes it as the sum of the rated output of heat and cooling generators; the exact calculation follows national rules.
Does it apply to residential buildings?
The BACS thresholds apply to non-residential buildings. New and majorly renovated residential buildings need electronic monitoring, effective controls and the ability to respond to external signals from 29 May 2026 (Article 13(11)); Member States may exempt single-family houses under major renovation where costs exceed benefits.
Has Hungary transposed the new directive?
On 10 November 2026 we found no legislation in the Hungarian legal database transposing Directive 2024/1275 or the 70 kW stage; Decree 9/2023 ÉKM in force contains the 290 kW obligation. Transposition is in progress and should be verified.
What is ISO 52120-1?
The standard describing the energy impact of building automation (EN ISO 52120-1:2022), successor of EN 15232-1. It groups functions and the level of automation into efficiency classes A to D.
Does BACS replace regular inspections?
Under Article 23(7), buildings complying with Article 13(10) or (11) are exempt from regular inspection of heating, ventilation and air-conditioning systems above 70 kW.
What is the difference between building automation and a BMS?
Building automation (BACS) is the whole chain: sensors, actuators, controllers and the operator level. The BMS (building management system) is its upper, operator part, where the operator sees alarms, measured values and energy use.
Do you take on building automation for office buildings or hotels?
Yes: the electrical installation, KNX and DALI-based room and lighting automation, metering and integration. HVAC control and the management system are developed together with the mechanical designer and suppliers; we quote after a site survey.