Knowledge base
Practical articles on electrical installation in family homes, smart homes and EV charging: what it costs, what pays off when, what to watch out for on site. Based on our own projects, updated regularly.
Smart home and KNX
The deciding factor is whether the walls are already plastered. Comparison, package prices, pitfalls.
Read →What the weather station measures, how the wind alarm protects blinds, and what happens in a power cut.
Read →Data Secure and IP Secure, tunnelling and routing, VPN remote access, manual control and the Cyber Resilience Act.
Read →What the Loxone Miniserver and Tree do, how KNX differs, when to choose which, and how Gira and MDT devices work together.
Read →Retrofitting without opening walls: Shelly behind the switch, neutral wire, Wi-Fi or Zigbee, Home Assistant and Philips Hue.
Read →Thermostatic valves, smart radiator thermostats, underfloor heating, heat pumps and KNX – and what the law requires.
Read →What supply the unit needs, where the controls go, and what the Zehnder ComfoConnect KNX C does – based on manufacturer data.
Read →Public price ranges by system – Shelly, FIBARO, Home Assistant, Grenton, Loxone, KNX – and what drives the total.
Read →How they differ, whether you need a hub or a Thread border router, what a Matter bridge is, and when KNX or DALI is better.
Read →Electrical installation
What an RCD protects, which type an EV charger or heat pump needs, and why an electrician should install it.
Read →Light and heavy-duty corrugated, rigid Mü-II and Mü-III conduit: location, 320 or 750 N, and what size the cable needs.
Read →What C16 and 6000 mean, how MCBs are sized, when a T1+T2 arrester is needed, and what to check between brands.
Read →Colours, frames, IP44, USB chargers, push-in terminals and smart versions from manufacturer catalogues.
Read →WAGO 221 and 2273, screw and spring terminal blocks: which wire, what current, and where joints are allowed.
Read →Price installed, power, built-in protection, load management, solar charging and app – from manufacturer datasheets, from an installer’s view.
Read →Initial verification, declaration of conformity, test reports, lightning protection and the as-built drawing under the Hungarian VMBSZ.
Read →Submeter or smart meter, when you need a MID meter, and how to meter solar, EV charging and a heat pump together.
Read →Lighting
LED profile, driver location, voltage drop, dimming – what to settle before the plasterboard goes up.
Read →Leading or trailing edge, minimum load, dimmable bulbs and drivers – how to stop LED flicker.
Read →What DALI does, when you need a KNX–DALI gateway, and when wireless Casambi is enough.
Read →Light that follows the time of day: what standards say about non-visual effects, and how to build it with DALI DT8, KNX or Casambi.
Read →Which wire goes where, changing a light safely, motion sensor lights and chandeliers – and when to call an electrician.
Read →Buried cable and conduit, IP ratings, RCDs, dusk sensors, motion sensors, extra-low voltage – and facade lighting.
Read →What the standard allows in zones 0, 1 and 2, which IP rating you need, where switches go, and good light at the mirror.
Read →General, task and accent light, the height of the dining pendant, and what to decide before drywall and tiling.
Read →What Ra measures, why R9 matters, what TM-30 adds, and what EN 12464-1 and the EU ecodesign rules require.
Read →DALI-2, D4i, DT6/DT8, KNX–DALI gateways (MDT, Gira, ABB, Lunatone) – what to check, based on datasheets.
Read →230 V vs 24/48 V track, run length and power supply, recessed installation in drywall, DALI/KNX control and popular systems from manufacturer data.
Read →Escape and exit-sign lighting, the Hungarian fire code and standards, duration, periodic testing and the log.
Read →Low-voltage systems
Cameras and access points on one cable: PoE, PoE+ and PoE++ power, PoE budget, the 100 m channel, cable choice.
Read →Which cable category, how many points, what a patch panel does, T568A or T568B, and what to test before handover.
Read →Weak Wi-Fi in the house? When an extender or mesh is enough, and when you need cabled ceiling access points.
Read →Is working-time recording mandatory in Hungary, may employees clock in by fingerprint: Labour Code, NAIH position, choosing a terminal.
Read →The 290 kW and 70 kW thresholds and deadlines of Directive (EU) 2024/1275, Hungarian rules and ISO 52120-1.
Read →Let’s talk about your project.
Tell us what you are planning and we will get back to you within a few days.
Get in touch