Home energy metering: submeters, MID certification, solar and EV charging together
A submeter is a meter fitted in the house’s own distribution board that measures one circuit separately – the EV charger, the heat pump, the solar inverter or a rented flat. It is not the utility’s smart meter: that one is installed and replaced by the distribution network operator and is the basis of your electricity bill. This article explains when a simple submeter is enough, when you need a MID-certified meter, and how to meter solar, EV charging and a heat pump together, including with KNX energy management.
In short
- Smart meter or submeter? The utility meter – conventional or smart – belongs to the network operator and is the basis of the bill; we do not install it. A submeter sits after it, in your own board, and measures your own circuits.
- MID certification: if money changes hands based on the submeter (tenant, annex, recharging of charging costs), a verified meter is needed; a MID meter carries a boxed “M” and the year next to the CE mark.
- Solar, EV charger and heat pump together: three or four metering points (grid connection, inverter, charger, heat pump) give you self-consumption and real costs.
- KNX energy management: KNX-capable meters feed the visualisation, and surplus solar can be steered to the charger or the heat pump automatically.
Author: Norbert Madarász
, Managing Director and Partner · Updated: 10 November 2026
Smart meter or submeter: what is this article about?
Many people searching for a “smart meter” mean the utility’s smart meter: the digital, remotely read electricity meter that the network operator fits in place of the old one. It belongs to the distribution network operator, sits under its seal, and your bill is based on it. Ordering, replacing and reading it is handled by the network operator and your supplier, not by an electrician.
What we do as electricians is the part before and after that meter: the meter point upgrade, and submeters in the house’s own distribution board. They serve your own decisions: how much the EV charger, the heat pump or a rented annex uses, and how much the solar system produces.
What is a submeter good for in a family house?
- EV charger: you see exactly how much energy went into the car; for a company car this can be the basis of reimbursement.
- Heat pump: real electricity use, compared with the heat delivered, shows how the unit performs in winter.
- Solar: a meter after the inverter shows actual production, not just the estimate.
- Rented flat, annex, workshop: consumption of a separately used part can be recharged fairly.
- Standby use: regular metering reveals a circuit that keeps drawing power at night.
A submeter is useful when you will act on the data: for decisions, billing or automation. A DIN-rail meter with a display is the simplest; if you want to collect the data, you need a communicating meter (KNX, Modbus or M-Bus).
When does a submeter need MID certification?
MID is the EU Measuring Instruments Directive (2014/32/EU). Its Annex V (MI-003) covers active electrical energy meters for residential, commercial and light industrial use. The manufacturer states the accuracy class as A, B or C; C is the most accurate. Conformity is shown by a boxed “M” and the last two digits of the year next to the CE mark (Article 21).
In Hungary, the implementing decree of the metrology act (Government Decree 127/1991) lists the instruments subject to mandatory verification. Active electrical energy meters are on the list when used for billing, for example measurements related to fair trading; the verification is valid for 12 years. Under section 5/A of the decree, such an instrument may also be placed on the market with a declaration or certificate of conformity – for a MID meter, the manufacturer’s EU declaration of conformity.
| What will you use the data for? | Is a verified (MID) meter required? | Note |
|---|---|---|
| Your own information, monitoring | not required | a MID meter is still more accurate and durable |
| Recharging a tenant, annex or workshop | yes, if someone pays based on the reading | track the validity of the verification (12 years) |
| Reimbursement of company-car charging at home | only a verified meter is suitable for billing | agree the tax side and the paperwork with your accountant |
| Solar or heat pump performance | not required | identical meters make readings comparable |
| Automation (load management, surplus control) | not required | you need a fast, communicating meter |
Solar, EV charger and heat pump together: where to meter?
With solar, an EV charger and a heat pump in the house, a single meter cannot tell you how much of your own production you use, or what charging really costs. You need metering points:
- Grid connection (the utility meter): energy imported and exported; the utility meter measures it, but for your own automation you usually need your own CT-operated meter at the feed-in point as well.
- Inverter output: the actual solar production. Many inverters report their own figures, but these are not verified.
- EV charger: many chargers come with a built-in (even MID) meter; if not, a submeter goes in front of it.
- Heat pump: a separate submeter for the outdoor and indoor unit circuits if you want to see its performance.
Self-consumption is then simple: production minus export. The power measured at the feed-in point is also the basis of load management: the charger knows how much current it may draw without tripping the main fuse. If the connection capacity is too small, a capacity upgrade is the next step.
What does KNX energy management add?
In a KNX smart home the meters go onto the bus. There are two ways: a meter with a KNX interface (for example Hager’s TXF121 for the maker’s meters with an infrared port, which passes imported and exported energy, power, voltage and current to KNX), or a MID meter with a built-in KNX module (for example ekinex’s CT-operated three-phase meter with bidirectional metering).
- Visibility: consumption per circuit appears in the KNX visualisation and the phone app.
- Surplus control: when solar produces more than the house uses, KNX logic switches on the hot-water cylinder, raises the heat pump set point or releases EV charging.
- Load shedding: when the house approaches its limit, less important loads (a sauna or the charger) temporarily reduce power.
- Alerts: a notification on unusual consumption or overvoltage.
We have already built KNX energy metering into a smart distribution board together with surge protection and RCDs. Our experience: metering is a small part of the investment; the benefit comes when automation and visualisation are thought through as well.
What to decide when planning the distribution board
- Space for meters: a three-phase submeter takes several module widths; leave room for a later charger or solar system.
- Direct or CT-operated: direct-connected meters for smaller circuits, CT-operated meters at the feed-in point and for large loads.
- Communication: KNX, Modbus or M-Bus, matching the other systems in the house; check the charger’s and inverter’s protocol too.
- Verification: MID meters wherever billing is involved, with the validity date on record.
- Documentation: which meter measures which circuit – on the board door and in the handover documents.
Related: Electrical installation · EV charger installation · Heat pump and solar connection · KNX smart home
Frequently asked questions
What is the difference between a smart meter and a submeter?
The smart meter is the digital version of the utility meter: it belongs to the network operator, is the basis of the bill and is installed by the operator. A submeter sits in the house’s own board after the utility meter and measures individual circuits for your own purposes.
Does a submeter need to be verified?
If someone pays based on the reading (tenant, annex, recharging of charging costs), a verified meter is needed – for a new meter usually a MID meter. For your own information it is not required.
How long is the verification of an electricity meter valid in Hungary?
Under Annex 2 of Government Decree 127/1991, 12 years for active electrical energy meters subject to mandatory verification. Keep track of it for a submeter used for billing.
Can a submeter measure solar production?
Yes, a submeter on the inverter output. For self-consumption you also need to meter the export to the grid; the difference is what you use yourself.
Does an EV charger need its own meter?
Yes, if the charger has no built-in meter or the reading is used for billing. Load management also needs a measurement at the house’s feed-in point.
What can KNX energy management do?
It shows consumption per circuit, steers solar surplus to the charger or heat pump, reduces less important loads before an overload, and sends alerts on unusual consumption.