ELECTRICAL DESIGN · CONSTRUCTION DRAWINGS · METERING PLAN

Electrical design for family houses: metering plan, construction drawings, smart home

Electrical design for family houses and flats, from the metering plan required for the grid connection to the power and low-voltage construction drawings. The drawings are produced by the chartered electrical engineers of our partner engineering office, Clevertech; you deal with us throughout. We coordinate with the architect and the HVAC engineer, handle the utility paperwork and install the system to the design: design and installation in one hand.

Electrical design and installation in one hand: what you gain

Most electrical designers only design and most electricians only install. If they are two separate firms, the client carries information between them, and what does not fit, what costs more and who is responsible only turns out on site. With us there is one contract, one contact and one party responsible.

One contactYou explain your needs once. We coordinate with the designer, the architect, the HVAC engineer and the ventilation installer.
Buildable drawingsThe design follows real installation methods, switch ranges and board sizes, because the people who will install it review it at the design stage.
Exact priceThe construction drawings become an itemised quote split into materials and labour, with no surprises later.
PaperworkWe take the metering plan and the connection request through the utility, up to energisation.
No finger-pointingDifferences between design and installation are not argued out between two firms: we are responsible to you for both.
Documented systemAs-built drawings, test reports and the board layout are yours at hand-over.
We, MDRSZ Elektrosingle point of contact and requirements, coordination with the architect and HVAC engineer, utility paperwork (metering plan, connection request, completion notice), installation to the design, testing, hand-over.
Our partner engineering officedrawings, sizing and signature by a chartered electrical designer.

Design can also be ordered on its own: you then receive an unpriced bill of quantities with the drawings that any contractor can quote on.

How much does electrical design cost?

Indicative prices from a November 2026 quotation for a family house of about 120 m² with an outbuilding (about 200 m² in total). The final fee depends on the size of the house and the scope of the design; we quote in writing, item by item, from the floor plan.

Metering plan: HUF 400,000 + VATthe grid connection, required by the utility
Power construction drawings: HUF 850,000 + VATthe 230/400 V installation from the connection to every load, with lightning protection
Low-voltage and building automation drawings: HUF 500,000 + VAToptional: smart home, security, network, intercom

What the metering plan contains

  • connection documents and technical description;
  • drawings of the connection method, the main protection, the unmetered main feed and the meter point;
  • handling the paperwork with the utility.

What the power construction drawings contain

  • cable routes from the connection to every load;
  • indoor and outdoor lighting and socket circuits;
  • supply of building services (heat pump, ventilation unit, pumps);
  • distribution boards and the main feeder design;
  • protection against electric shock and equipotential bonding;
  • lightning protection design to the standard, with risk assessment;
  • surge protection.

What the low-voltage and building automation drawings contain

  • heating and cooling control;
  • shading and lighting control (smart home);
  • conduit plan and device layout for security systems (alarm, CCTV);
  • IT (wired and wireless) and cable TV network;
  • video intercom.

All three together come to HUF 1,750,000 + VAT in this example. If we also do the installation, the drawings turn directly into an itemised installation quote.

When is an electrical design mandatory?

In Buda and most of Pest County the distribution system operator is ELMŰ Hálózati (E.ON group). Its distribution business rules state:

  • A new connection needs a design. Before the building is built, the user must have technical drawings made by an authorised electrical designer covering the grid connection, the connection to the building, the first main protection, the unmetered main feed and the meter location. Only members of the Hungarian Chamber of Engineers with a design licence may prepare them (section 8.10).
  • The metering plan is a condition of connection. A metering plan must be prepared for the billing meter and submitted electronically to the operator for review (section 8.10).
  • Exception: for low-voltage direct metering no metering plan is needed if a registered electrician listed on the operator’s website builds the meter point at the connection point with a type-approved meter cabinet. The electrician’s declaration then replaces the plan (sections 8.10 and 10.1).
  • A design is always needed, for example, if the meter point is not at the connection point (with the operator’s permission), if the installer is not registered, if the requested capacity exceeds 3×80 A, or if the metering uses current transformers. This applies to new requests, capacity upgrades and meter relocations alike (section 8.10).
  • For solar PV (small-scale generation) the operator requires a connection request and connection documents before energisation; see our page on solar PV design.

Whether the building procedure needs an electrical section for the installation behind the meter is decided by the responsible architect. For the installation itself, construction drawings are always worth having: without them there is no exact quote, and the electrician decides on site what should have been calculated at the desk. More on the meter point: meter point upgrade.

In other network areas (MVM, Opus Titász) the operator’s own business rules apply; we check the conditions with the operator at the design stage. This summary is for information only, not legal advice.

Simplified permit, metering plan or construction drawings: what is the difference?

Design levelWhat it containsWhat it is for
Metering plan (connection documents)connection method, main protection, unmetered main feed, meter point, technical descriptionthe utility connection and capacity upgrades
Electrical section for the simplified permittechnical description, expected power demand, layout of the main elementsthe notification documents, if the responsible architect asks for it
Power construction drawingsroutes, boards, circuits, cable and protection sizing, outlets per room, bonding, lightning and surge protectionan exact quote, the installation and later extensions
Low-voltage and building automation drawingssmart home, security, IT network, intercom, conduit planso conduits and boxes are placed before bricklaying or prefabrication

What do the power drawings contain?

Boards and circuitsSingle-line diagrams of the main and sub-boards: MCBs, RCDs, surge protection, spare ways; every outlet assigned to a circuit.
SizingMain feed, cable cross-sections and protection sized for load and length, with voltage drop and selectivity checks, to the MSZ HD 60364 series.
Meter point and capacityThe connection capacity needed for appliances, heat pump, solar and EV charger.
Shock protection and earthingEquipotential bonding, earthing, bathroom zones, outdoor and wet areas.
Lightning and surge protectionLightning protection design with risk assessment, and surge arrester stages from the meter point to sensitive loads.
Building services and renewablesSupply for heat pump, ventilation unit, solar, battery and EV charger, even if they come later: preparing now is cheapest.

Smart home design and low-voltage drawings

For us, smart home design is part of the electrical design, not an add-on. The KNX smart home bus cable, the heating and shading outlets and the sensor positions are drawn on the same floor plan as the power installation, so routes do not cross and the board has room for the actuators.

Structured cablingCat6A outlets in every room, a central rack, Wi-Fi access points planned for coverage.
SecurityConduit plan and device layout for cameras, alarm sensors, access control and intercom, PoE-powered where possible.
Building automationKNX bus and DALI lighting control routes, heating and cooling control, shading, keypads and sensors.
RoutesLow-voltage cables separated from power, at the required distance and crossing at right angles, in separate conduits.

More: low-voltage systems · lighting design.

How does the design process work?

  1. 1
    Requirements

    House size, heating, planned appliances, solar, EV charger, ventilation, smart home and low-voltage systems.

  2. 2
    Floor plan and wall elevations

    From the architect’s plan and, ideally, the interior designer’s wall elevations we fix the outlets room by room. If there are no elevations, we help draw them.

  3. 3
    Metering plan and connection

    If a new connection or a capacity upgrade is needed, the metering plan comes first, because the utility procedure takes longest.

  4. 4
    Design and sizing

    Our partner engineering office produces the power and low-voltage drawings and sizes cables and protection; we review buildability.

  5. 5
    Review

    We go through the design and incorporate changes until every outlet and route is in place.

  6. 6
    Hand-over and installation

    PDF and editable drawings with an unpriced bill of quantities. If we also install, the system is built to the design, with testing and documentation.

Frequently asked questions

How much does an electrical design for a family house cost?

For an example of about 200 m² (a 120 m² house plus an outbuilding), at November 2026 indicative prices: metering plan HUF 400,000 + VAT, power construction drawings HUF 850,000 + VAT, optional low-voltage and building automation drawings HUF 500,000 + VAT. The final fee depends on the size and scope; we quote in writing from the floor plan.

What is a metering plan and do I need one?

The metering plan is the design of the grid connection: connection method, main protection, unmetered main feed and meter point. Under ELMŰ Hálózati’s business rules it is a condition of connection. It is not needed for low-voltage direct metering if a registered electrician builds the meter point at the connection point with a type-approved cabinet; the electrician’s declaration replaces it.

Is a design needed for a capacity upgrade?

If the meter point is at the connection point with a type-approved cabinet and a registered electrician does the work, the declaration replaces the design. A design is needed, for example, above 3×80 A, with current-transformer metering, if the meter point is not at the connection point, or if the installer is not registered.

Who may produce electrical designs?

Connection documents and building electrical designs may be prepared and signed by members of the Hungarian Chamber of Engineers with an electrical design licence. Our partner engineering office’s licensed designers produce the drawings; contact, coordination and installation are our job.

When should the electrical design be made?

For a new house, the metering plan as early as possible, because the utility procedure takes longest. The construction drawings at the latest before bricklaying, or before the production drawings of a precast house. For renovations before demolition.

Do you offer design only, without installation?

Yes. You receive the drawings and an unpriced bill of quantities that any contractor can quote on.

Do you design for existing houses?

Yes: before a renovation, capacity upgrade, solar, heat pump or EV charger, we survey the existing installation and design for it.

Let’s talk about your project.

Tell us what you are planning and we will get back to you within a few days.

Get in touch

Cookie settings

Choose what you consent to. We remember your choice for 6 months; change it any time via “Cookie settings” in the footer.

Privacy notice