HEAVY CURRENT · HEAT PUMP · SOLAR PV

Electrical connection of heat pumps and solar PV in family homes

The electrical connection of a heat pump or a solar PV system is done by a qualified electrician, to standard (MSZ HD 60364): a dedicated circuit, the circuit breaker and residual current device the manufacturer specifies, a correctly sized cable, the meter cabinet and the paperwork with the grid operator. The hydraulics and the buffer tank are connected by the plumber; we do the electrical side. We work in Buda and its suburbs and hand over with a safety test report.

What does the electrical connection of a heat pump include?

A heat pump – monobloc, split, air-to-water or pool heat pump – is one of the largest loads in the house. It always gets a dedicated circuit from the distribution board, and we choose its protection according to the manufacturer’s installation manual.

ItemWhat we doWho does it
Dedicated circuitown circuit breaker in the board, with the rating and curve the manufacturer specifieselectrician
Residual current devicethe type the manufacturer requires (often type A or B for inverter units)electrician
Cable sizingcross-section for the current draw, cable length and installation methodelectrician
Outdoor unit supplyUV-resistant cable in conduit, isolator next to the unit if requiredelectrician
Controlthermostat, SG Ready signal, H-tariff control, KNX on requestelectrician
Hydraulics, buffer tankpiping, buffer tank connection, filling, ventingplumber
Refrigerant circuit (split units)refrigerant lines, pressure test, chargingF-gas certified installer

Connecting a monobloc heat pump is simpler on the electrical side: the refrigerant circuit is sealed at the factory, and only water pipes and cables go indoors. A pool heat pump is usually smaller, but it stands outdoors in a wet environment, so the RCD and outdoor cable routing matter even more.

The SG Ready input uses two contacts to tell the heat pump when cheap or self-generated power is available. In a house with solar PV, the unit can then preheat the buffer or hot water during the day.

H tariff or GEO tariff: what are they for and what do you need?

The H tariff is a discounted rate for heat pump and renewable heating in Hungary. According to MVM Hálózat, it applies from 15 October to 15 April; outside this period consumption is billed at the standard A1 rate. Only heating equipment with a SCOP of at least 3.4 (average climate) may be connected to it.

CriterionH tariffGEO tariff (B GEO)
Availabilitycan still be applied forno new contracts since 1 September 2021
Period15 October – 15 April, 24 hours a dayall year, at least 20 hours a day
Interruptionsnoneup to two breaks a day, max. 2 hours each
Meteringseparately metered circuit, new two-rate metercontrolled circuit
EquipmentSCOP ≥ 3.4 (average climate)minimum COP per EN 14511
Connectionhard-wired only, no other loads on itcontrolled connection point

The “GEO or H” question is settled for new homes: no new GEO contracts can be signed, so the choice is between the H tariff and the standard (A1) rate. Existing GEO contracts may remain in force.

For the H tariff you apply to the grid operator with the heat pump datasheet (rated electrical power, heating output, SCOP), and a circuit separate from the existing A1 circuit has to be installed. If the meter cabinet has no room for the new meter or does not meet current rules, a new one is needed. We check this during the survey and prepare the application.

For a pool heat pump the H tariff rarely saves money: pools are heated in summer, when the H-tariff meter bills at the A1 rate anyway.

Do you need a capacity upgrade for a heat pump or solar PV?

Often, yes. A 1×32 A or 3×16 A connection cannot carry a heat pump, an induction hob and an EV charger together. The PV inverter can also only connect within the available capacity: the grid operator checks whether the inverter output current fits. During the survey we add up the load and, if needed, handle the capacity upgrade as well. The grid operator’s procedure takes several weeks, sometimes a few months.

Solar PV design: design and installation in one hand

We take on solar PV systems including the design. We size the system from the household’s consumption (heat pump, EV charger, appliances) and the available connection capacity; the connection documents are prepared by an electrical designer of our partner engineering office, and we handle the grid operator and the electrical installation. Solar, heat pump, EV charger and the distribution board are on one design, with one party responsible.

The operator’s rules set the frame. In Buda and most of Pest County the operator is ELMŰ Hálózati (E.ON group); its business rules state:

  • Small-scale limit: a household-scale power plant (HMKE) is a generator connected to the low-voltage grid with a connection capacity of at most 50 kVA per connection point (section 2.28).
  • How much can be fed in? The upper limit is the capacity available to the user at the connection point (kVA), at most 50 kVA; for inverter systems the inverter’s rated power counts. A larger system first needs a capacity upgrade (section 5.11).
  • Single or three phase? Single-phase generators may be connected up to 2.5 kVA, above that only three-phase; for three-phase systems made of several inverters the phase imbalance may be at most 2.5 kVA (section 5.11).
  • If the grid cannot take it: where regulations or grid parameters do not allow export, the user must prevent it with their own device controlling the inverter output (section 5.11).
  • Where it cannot be connected: among others, temporary connection points and seasonally operated, separately metered (B or H tariff) networks (section 5.11).

For us PV design is not a separate job: if we also produce the house’s electrical design, the inverter circuit, surge protection, meter point and room for a later battery or EV charger are already in it.

How is a solar PV system connected?

On the electrical side, connecting solar PV runs from the AC side of the inverter to the meter cabinet. We take on solar PV systems including the design (see below). Until a small-scale power plant (HMKE) is switched on, the steps are:

  1. ApplicationBefore installation, an application must be filed with the grid operator. It checks the local grid, the inverter type and power, and the symmetry of feed-in.
  2. Connection documentsA single-line diagram and a technical description of the inverter, protection and meter cabinet, prepared by an electrical designer or contractor.
  3. AC-side connectionA dedicated inverter circuit, circuit breaker, RCD as specified by the manufacturer, surge protection and, if needed, meter cabinet changes.
  4. Completion noticeWe report the finished system and internal wiring to the grid operator, with a safety test report.
  5. Meter change and commissioningThe grid operator inspects on site, replaces the meter with a bidirectional one if needed, and then commissions the system.

According to MVM Hálózat, the average time from application to switch-on is 4–6 months, longer if a capacity upgrade is needed. Systems built on applications filed after 7 September 2023 are settled gross: imported and exported energy are billed separately (E.ON).

Why not connect solar PV yourself?

  • It cannot be switched on without approval. For a grid-connected house, an application is required before the system is installed. Commissioning before approval breaches the contract, carries a penalty, and even a test run is not allowed.
  • Only a registered electrician may work in the meter cabinet. Building or altering the meter cabinet is reserved for registered contractors who know the grid operator’s rules.
  • Plug-in “balcony” panels may not be connected to the grid. According to the grid operator, they cannot be reliably isolated and endanger the line workers.
  • Standard and test report. The connection follows MSZ HD 60364, and the completion notice needs a safety test, which we carry out with our certified partner.

What is a PV wiring diagram, and who draws it?

The PV wiring diagram is a single-line diagram showing the strings, the inverter, the DC and AC protection, the surge arresters and the meter cabinet. It is part of the connection documents, and the grid operator decides on the application based on it. If we also prepare the electrical design of the house, the PV and the heat pump are already in it.

How can you see consumption and production?

In a KNX smart home, the heat pump, the PV system and the EV charger appear in one system: energy metering per circuit, water heater and charger control matched to production, and an SG Ready signal for the heat pump. More of your own power stays in the house.

How much does connecting a heat pump or solar PV cost?

WorkTypical scopeLabour
Heat pump electrical connectiondedicated circuit, protection, cable to the outdoor unit, controlquoted after a site survey
Separately metered H-tariff circuitseparate circuit, meter cabinet preparation, applicationquoted after a site survey
PV AC-side connectioninverter circuit, protection, surge protection, completion noticequoted after a site survey

The price depends mainly on cable length, the state of the distribution board, and whether a new meter cabinet or a capacity upgrade is needed. Private customers pay 0% VAT, as our company is VAT-exempt. We quote item by item after a site survey.

Frequently asked questions

How much does a heat pump electrical connection cost?

We quote the labour for the electrical connection item by item after a site survey. The price depends on cable length, the distribution board and whether an H-tariff circuit or a capacity upgrade is needed. Private customers pay 0% VAT, as our company is VAT-exempt.

Do I need the H tariff for a heat pump?

It is not mandatory, but it can pay off for heating: from 15 October to 15 April consumption is billed at a discounted rate. It requires a separately metered circuit, a new two-rate meter and a SCOP of at least 3.4.

GEO or H tariff – which one?

New applications can only get the H tariff: no new GEO contracts have been signed since 1 September 2021. GEO ran all year with two short daily breaks; the H tariff is discounted only in the heating season, but without interruptions.

Do I need a capacity upgrade for a heat pump?

Often, especially if the house also has an induction hob, an EV charger or solar PV. We add up the load during the survey and, if needed, handle the upgrade with the grid operator.

Can I connect solar PV myself?

No. PV may only be connected to the grid after the grid operator has approved the application, only a registered electrician may work in the meter cabinet, and the completion notice needs a safety test report. Commissioning before approval breaches the contract and carries a penalty.

How long does it take?

We give the on-site time for a heat pump connection at the survey. For PV the grid procedure takes longer: according to MVM Hálózat, 4–6 months on average from application to switch-on.

Let’s talk about your project.

Tell us what you are planning and we will get back to you within a few days.

Get in touch

Cookie settings

Choose what you consent to. We remember your choice for 6 months; change it any time via “Cookie settings” in the footer.

Privacy notice