E-MOBILITY · MG HOME CHARGING

MG4 home charging: wallbox installation for family homes

For charging an MG4 at home, the version you own decides how the wallbox is set up: the 51 kWh and Standard Range versions charge on a single phase only, at up to 6.6 kW, while the 64 kWh version charges on three phases at 11 kW. For a single-phase MG4 the charger has to be set to 32 A on one phase, because a 3×16 A setting gives only about 3.7 kW. As an independent electrician we choose and set up the charger for the car and the house supply, build the circuit and, if needed, handle the capacity increase with the utility. We are not an official MG partner; we hand over the installation with protection tests and a test report.

How fast does each MG4 charge at home?

The MG4 51 kWh and the Standard Range charge on a single phase only, at up to 6.6 kW; the MG4 64 kWh charges on three phases at 11 kW (3×16 A).

Model (version)Max. AC chargingPhases × currentUsable battery0–100 % at max. AC
MG4 Electric 51 kWh6.6 kWsingle phase only50.8 kWhapprox. 9 h 15 min
MG4 Electric Standard Range6.6 kWsingle phase only47.1 kWhapprox. 8 h 30 min
MG4 Electric 64 kWh11 kW3×16 A61.7 kWhapprox. 6 h 45 min

Source: ev-database.org. None of these versions accepts 22 kW on AC, so a 22 kW connection does not speed up an MG4. All three versions charge fully overnight if the wallbox is set up correctly.

Why is the MG4 51 kWh slow on a three-phase wallbox?

Because a single-phase MG4 uses only one phase of a three-phase wallbox. If the charger is set to 3×16 A, the car gets a single 16 A phase, which is about 3.7 kW: just over half of the possible 6.6 kW, so charging takes almost twice as long.

For the full 6.6 kW the wallbox must be able to deliver 32 A on one phase, and the house must be able to supply it: the meter needs a main fuse of at least 32 A on that phase. On the common 3×16 A connection this often means a capacity increase with the utility. There are two good solutions:

  • A single-phase 32 A connection, or a charger that can be set to 32 A on one phase — if only the single-phase MG4 charges at the house.
  • A three-phase charger that can also deliver 32 A on one phase — if a three-phase 11 kW car (for example an MG4 64 kWh or a Tesla) charges there too, now or later.

For the MG4 64 kWh the usual 3×16 A, 11 kW connection is right; it does not need 32 A on one phase. The same applies to other brands: the 44.9 kWh BYD Dolphin and the Smart #1 Pro also charge on a single phase only.

How do I know which MG4 I have?

From the battery capacity: it is stated in the purchase contract, the dealer’s equipment list or the car’s data sheet. For the 51 kWh or Standard Range version we plan single-phase charging; for the 64 kWh version, three-phase.

We always ask about this during the survey, because it determines the charger setting, the cable and whether a capacity increase is needed. If you are still choosing a car, consider the house supply as well: on a 3×16 A supply the three-phase MG4 64 kWh can use its 11 kW without an upgrade if load management allows, while the full 6.6 kW of the single-phase version often requires one.

Do I need an MG wallbox, or does any wall charger work with the MG4?

Any Type 2 wall charger works: the MG4 sold in Europe uses Type 2 for AC charging and CCS2 for DC fast charging. A home wallbox is AC, so it has a Type 2 connector; the charging speed is limited by the car’s on-board charger (6.6 or 11 kW), not by the brand of the charger.

What matters is the setting: 32 A on one phase for a single-phase MG4, 3×16 A for the three-phase one. With a tethered wallbox you do not need a separate cable at home; a socket-type (untethered) charger and public AC charging points need a Type 2 to Type 2 cable.

Which wall charger should I choose for an MG4?

For a single-phase MG4, a wallbox that can be set to 32 A on one phase; for the 64 kWh version, an 11 kW (3×16 A) charger. Through our wholesale partners we can source and install several brands:

BrandModelSourced via
Schneider ElectricEVlink Home, EVlink Charge ProMile Kft.
ABBTerra AC (W4–W22)Mile Kft.
BesenWallbox Smart 11/22 kWMile Kft.
FroniusWattpilot Home 11/22 kWMile Kft.
TeslaWall Connector Gen 3Mile Kft.; charges other brands too if enabled
HagerwittyVoltus
EaseeChargeVoltus

Before recommending a model for a single-phase MG4, we check in the manufacturer’s data sheet that it can be set to 32 A on one phase. More on the Tesla Wall Connector on our Tesla home charger page.

What does the house need for an MG4 wall charger?

ElementWhy it is neededWhat we check
Supply and phasesthe MG4 51 kWh and Standard Range need 32 A on one phase, the MG4 64 kWh needs 3×16 Anumber of phases and main fuse at the meter
Capacitythe charger draws close to full current for hours alongside the other loadsif it is not enough, we request an increase from the distribution operator (E.ON, MVM or Opus Titász)
Dedicated circuit and cablethe charger cannot share its circuitits own breaker; the cross-section depends on the current and the length of the run
Residual current device (RCD)the car can cause DC fault currents that a standard type A RCD does not detecttype A-EV or B, depending on the charger’s built-in DC detection
Load managementthe oven or the heat pump may run while the car chargeswe set the charger’s current limit to the house
Solar chargingdaytime surplus goes into the car instead of the grida wallbox or control that follows the current PV output
Cable route and locationgarage, carport or fence; it has to work in rain and frostIP rating, cable routing, buried cable if needed

Rules and cost factors are described on our EV charger installation page; if the meter cabinet or the distribution board also needs replacing, see electrical installation. In a new house we plan the charger cable and the board space during electrical design.

How much does MG4 charger installation cost, and is there a grant?

The installation price depends on the cable run, the condition of the distribution board and whether a capacity increase is needed; with a single-phase MG4 the latter is more common. Indicative prices are on our EV charger installation page; we give an exact quote after a site survey or from photos of the meter cabinet and the distribution board. The quotation lists the charger, the installation and the paperwork on separate lines. You can send photos via the details on our contact page.

There is no state grant for private home chargers in October 2026, and there has never been a dedicated programme: the E-AUTO-2021 residential scheme only supported buying the car.

How does an MG4 charger installation work?

  1. 1
    Survey or photos

    We ask which MG4 (51 kWh, Standard Range or 64 kWh) will charge, and check the meter (phases, main fuse), the distribution board and the cable route. In simpler cases, photos of the meter cabinet and the board are enough for a first quotation.

  2. 2
    Quotation and choice of charger

    A charger matching the car’s phases, cable, protection, board extension and paperwork on separate lines.

  3. 3
    Paperwork

    If needed, notification or capacity increase with the distribution operator; the installation date then follows the utility’s procedure, which takes several weeks, sometimes a few months.

  4. 4
    Installation

    Dedicated circuit from the main board, sized cable, circuit breaker and a suitable RCD, mounting the charger. The installation itself is usually short.

  5. 5
    Commissioning and handover

    Setting the charger’s phase configuration and current limit for the MG4 and the house (1×32 A for the single-phase versions), a test charge, protection tests and test report, and a walk-through.

Frequently asked questions

Do you install a charger for a MG bought from wallbox.hu or another web shop?

Yes. We install Type 2 wall chargers bought from wallbox.hu or any other web shop for a MG too: we build the circuit, mount and commission the charger, and hand over the electrical safety test report. It is worth checking with us before you buy: the MG4 51 kWh charges on a single phase only, so the charger must be set to 1×32 A.

Which charger does the MG4 need?

Any Type 2 wall charger, but the setting depends on the version: the MG4 51 kWh and the Standard Range charge on a single phase only (up to 6.6 kW), so the charger has to be set to 32 A on one phase; the MG4 64 kWh charges on three phases at 11 kW, so a 3×16 A wallbox is right for it.

Why does my MG4 charge at only 3.7 kW on my wallbox?

Most likely it is a single-phase MG4 (51 kWh or Standard Range) on a three-phase charger set to 3×16 A: it gets a single 16 A phase, which is about 3.7 kW. For the full 6.6 kW the charger has to deliver 32 A on one phase, and the house supply has to allow it.

How long does an MG4 take to charge at home?

At maximum AC power the MG4 51 kWh takes about 9 hours 15 minutes, the Standard Range about 8 hours 30 minutes and the MG4 64 kWh about 6 hours 45 minutes from 0 to 100 % (ev-database.org).

Do I need a 22 kW charger for an MG4?

No. The MG4 charges on AC at 11 kW at most (the single-phase versions at 6.6 kW), so a 22 kW connection is not faster, only more expensive.

Can I charge an MG4 from a normal socket?

Occasionally, with a portable charging cable, yes, but it is slow (about 2.3 kW), and a standard socket and circuit are not made for hours of near-full load. For regular charging we recommend a wall charger on a dedicated circuit.

Are you an official MG partner?

No. As an independent electrician we install wall chargers for electric cars of any brand to the electrical standards, with protection tests and a test report.

Is there a grant for home chargers?

In October 2026 there is no open state grant for private home chargers; the E-AUTO-2021 residential scheme also only supported buying the car.

Let’s talk about your project.

Tell us what you are planning and we will get back to you within a few days.

Get in touch

Cookie settings

Choose what you consent to. We remember your choice for 6 months; change it any time via “Cookie settings” in the footer.

Privacy notice