Smart #1 home charging: wallbox installation for family homes
The two Smart #1 versions need very different home setups: the Smart #1 Pro charges on a single phase only, at up to 7.4 kW (1×32 A), while the Pro+ and Premium charge at 22 kW on three phases (3×32 A) from the factory. For the Pro the wallbox has to be set to 32 A on one phase; for the Pro+ and Premium you decide whether to install 11 or 22 kW. As an independent electrician we choose and set up the charger for the car and the house supply, build the circuit and, if needed, handle the capacity increase with the utility. We are not an official Smart partner; we hand over the installation with protection tests and a test report.
How fast does each Smart #1 charge at home?
The Smart #1 Pro charges on a single phase only, at up to 7.4 kW (1×32 A); the Pro+ and Premium charge at 22 kW on three phases (3×32 A) from the factory.
| Version | Max. AC charging | Phases × current | Usable battery | 0–100 % at max. AC |
|---|---|---|---|---|
| Smart #1 Pro | 7.4 kW | 1×32 A only | 47 kWh | approx. 7 h 30 min |
| Smart #1 Pro+ / Premium | 22 kW (factory) | 3×32 A | 62 kWh | approx. 3 h 30 min |
Source: ev-database.org. The difference is not only in charging time but on the house side too: one version needs one strong phase, the other three phases.
Why does the Smart #1 Pro need 32 A on one phase?
Because the Smart #1 Pro uses only one phase. A three-phase wallbox set to 3×16 A therefore gives it a single 16 A phase, which is about 3.7 kW: half of the possible 7.4 kW, so charging takes about twice as long.
For the full 7.4 kW the wallbox must deliver 32 A on one phase, and the house must be able to supply it: the meter needs a main fuse of at least 32 A on that phase. On the common 3×16 A connection this often means a capacity increase with the utility. There are two good solutions:
- A single-phase 32 A connection, or a charger that can be set to 32 A on one phase — if only the Smart #1 Pro charges at the house.
- A three-phase charger that can also deliver 32 A on one phase — if a three-phase car (for example a Smart #1 Pro+ or a Tesla) charges there too, now or later.
The same applies to the single-phase versions of the MG4 and to the 44.9 kWh BYD Dolphin.
Do I need a 22 kW charger for the Smart #1 Pro+ or Premium?
Not necessarily. The Pro+ and Premium can charge at 22 kW from the factory, but they also charge well on an 11 kW (3×16 A) wallbox: it takes about twice as long as at 22 kW, but one night (8 hours) at 11 kW gives about 88 kWh, which still fills the 62 kWh battery completely.
22 kW needs a 3×32 A charging circuit: a thicker cable, a larger breaker and, because the house has to supply its other loads at the same time, often a capacity increase and load management. It is worth it if you need to add a lot of charge during a short daytime stop, or if the house supply is being upgraded anyway. We decide together during the survey, based on the house supply and your daily mileage. The same considerations apply to the 22 kW option of the Toyota bZ4X.
How do I know which Smart #1 I have?
From the trim level and the battery: the Pro has 47 kWh usable capacity, the Pro+ and Premium 62 kWh. This is stated in the purchase contract, the dealer’s equipment list or the car’s data sheet.
We always ask about this during the survey, because it determines the charger setting (1×32 A or 3×16/3×32 A), the cable and whether a capacity increase is needed. If you are still choosing, consider the house supply as well: on a 3×16 A supply the full 7.4 kW of the Pro often requires an upgrade, while the Pro+ and Premium charge well at 11 kW without one if load management allows.
Do I need a Smart wallbox, or does any wall charger work with the Smart #1?
Any Type 2 wall charger works: the Smart #1 sold in Europe uses Type 2 for AC charging and CCS2 for DC fast charging. A home wallbox is AC, so it has a Type 2 connector; the charging speed is limited by the car’s on-board charger (7.4 or 22 kW) and the charger setting, not by the brand of the charger.
With a tethered wallbox you do not need a separate cable at home; a socket-type (untethered) charger and public AC charging points need a Type 2 to Type 2 cable. For 22 kW charging the cable must also be rated for 32 A.
Which wall charger should I choose for a Smart #1?
For the Pro, a wallbox that can be set to 32 A on one phase; for the Pro+ and Premium, an 11 or 22 kW charger depending on the house supply. Through our wholesale partners we can source and install several brands:
| Brand | Model | Sourced via |
|---|---|---|
| Schneider Electric | EVlink Home, EVlink Charge Pro | Mile Kft. |
| ABB | Terra AC (W4–W22) | Mile Kft. |
| Besen | Wallbox Smart 11/22 kW | Mile Kft. |
| Fronius | Wattpilot Home 11/22 kW | Mile Kft. |
| Tesla | Wall Connector Gen 3 | Mile Kft.; up to 22 kW, charges other brands too if enabled |
| Hager | witty | Voltus |
| Easee | Charge | Voltus |
We check the power of the chosen model and whether it can be set to 32 A on one phase in the manufacturer’s data sheet before recommending it for a given Smart #1. More on the Tesla Wall Connector on our Tesla home charger page.
What does the house need for a Smart #1 wall charger?
| Element | Why it is needed | What we check |
|---|---|---|
| Supply and phases | the Pro needs 32 A on one phase, the Pro+ and Premium need 3×16 A (11 kW) or 3×32 A (22 kW) | number of phases and main fuse at the meter |
| Capacity | the charger draws close to full current for hours alongside the other loads | if it is not enough, we request an increase from the distribution operator (E.ON, MVM or Opus Titász) |
| Dedicated circuit and cable | the charger cannot share its circuit | its own breaker; the cross-section depends on the current and the length of the run, thicker for 32 A |
| Residual current device (RCD) | the car can cause DC fault currents that a standard type A RCD does not detect | type A-EV or B, depending on the charger’s built-in DC detection |
| Load management | the oven or the heat pump may run while the car charges | we set the charger’s current limit to the house |
| Solar charging | daytime surplus goes into the car instead of the grid | a wallbox or control that follows the current PV output |
| Cable route and location | garage, carport or fence; it has to work in rain and frost | IP rating, cable routing, buried cable if needed |
Rules and cost factors are described on our EV charger installation page; if the meter cabinet or the distribution board also needs replacing, see electrical installation. In a new house we plan the charger cable and the board space during electrical design.
How much does Smart charger installation cost, and is there a grant?
The installation price depends on the cable run, the condition of the distribution board and whether a capacity increase is needed; a 22 kW installation costs more, and the single-phase 32 A connection for the Pro also needs an upgrade more often. Indicative prices are on our EV charger installation page; we give an exact quote after a site survey or from photos of the meter cabinet and the distribution board. The quotation lists the charger, the installation and the paperwork on separate lines. You can send photos via the details on our contact page.
There is no state grant for private home chargers in October 2026, and there has never been a dedicated programme: the E-AUTO-2021 residential scheme only supported buying the car.
How does a Smart charger installation work?
- 1Survey or photos
We ask which Smart #1 (Pro, Pro+ or Premium) will charge, and check the meter (phases, main fuse), the distribution board and the cable route. In simpler cases, photos of the meter cabinet and the board are enough for a first quotation.
- 2Quotation and choice of charger
A charger matching the car and the house (1×32 A, 11 or 22 kW), cable, protection, board extension and paperwork on separate lines.
- 3Paperwork
If needed, notification or capacity increase with the distribution operator; the installation date then follows the utility’s procedure, which takes several weeks, sometimes a few months.
- 4Installation
Dedicated circuit from the main board, sized cable, circuit breaker and a suitable RCD, mounting the charger. The installation itself is usually short.
- 5Commissioning and handover
Setting the charger’s phase configuration and current limit for the Smart #1 and the house, a test charge, protection tests and test report, and a walk-through.
Frequently asked questions
Do you install a charger for a Smart bought from wallbox.hu or another web shop?
Yes. We install Type 2 wall chargers bought from wallbox.hu or any other web shop for a Smart too: we build the circuit, mount and commission the charger, and hand over the electrical safety test report. It is worth checking with us before you buy: the Smart #1 Pro charges on a single phase only (7.4 kW), so the charger must be set to 1×32 A.
Which charger does the Smart #1 Pro need?
A Type 2 wall charger that can deliver 32 A on one phase, because the Pro charges on a single phase only, at up to 7.4 kW. The house supply also has to allow 32 A on one phase, which on a 3×16 A connection often means a capacity increase.
Why does my Smart #1 Pro charge at only 3.7 kW on my wallbox?
Because the Pro is single-phase, and a three-phase charger set to 3×16 A gives it only one 16 A phase, which is about 3.7 kW. For the full 7.4 kW the charger has to deliver 32 A on one phase.
Do I need a 22 kW wallbox for the Smart #1 Pro+ or Premium?
Not necessarily. It can charge at 22 kW from the factory (about 3 hours 30 minutes from 0 to 100 %), but it also charges fully overnight on an 11 kW wallbox. 22 kW needs a 3×32 A connection, which often involves a capacity increase.
How long does a Smart #1 take to charge at home?
At maximum AC power the Pro takes about 7 hours 30 minutes, and the Pro+ and Premium about 3 hours 30 minutes at 22 kW, from 0 to 100 % (ev-database.org).
Can I charge a Smart #1 from a normal socket?
Occasionally, with a portable charging cable, yes, but it is slow (about 2.3 kW), and a standard socket and circuit are not made for hours of near-full load. For regular charging we recommend a wall charger on a dedicated circuit.
Are you an official Smart partner?
No. As an independent electrician we install wall chargers for electric cars of any brand to the electrical standards, with protection tests and a test report.
Is there a grant for home chargers?
In October 2026 there is no open state grant for private home chargers; the E-AUTO-2021 residential scheme also only supported buying the car.
Let’s talk about your project.
Tell us what you are planning and we will get back to you within a few days.
Get in touch