KNX reference: smart home in a single-storey passive house

We are working on the complete power and low-voltage installation of a single-storey passive house in the Buda agglomeration near Budapest, including a KNX smart home system. The house has about 165 m² of living space and a 45 m² garage. The project is ongoing in autumn 2026; the figures below come from the construction and as-built documentation. At the client’s request, the location is not named. We are a KNX Partner.

In brief

  • 129 KNX devices on two bus lines (main line and sub-line with a line coupler), two power supplies on a UPS circuit.
  • 252 switched channels on 21 twelve-channel MDT switch actuators, plus heating, shading and dimming actuators.
  • 15 underfloor heating circuits with room-by-room control, 14 blind motors, DALI lighting on two DALI lines.
  • Building services on KNX: heat pump, heat-recovery ventilation (Zehnder ComfoAir Q450), air conditioning, gate, water meters.
  • Energy: 4 KNX energy meters, a PV system and dynamic load management of the two EV chargers via KNX.
  • Documentation: single-line diagrams, panel layouts, a 75-page cable book with 214 cables, a test programme.

Author: Norbert Madarász, Managing Director and Partner · Updated: 14 November 2026

Starting point

The client is building a passive house: high insulation, airtightness, heat-recovery ventilation, a heat pump, underfloor heating and PV. Many building-services systems work side by side in such a house, and they only work well when they are controlled together. That is why lighting, shading, heating, ventilation and energy metering share one KNX system.

The electrical design was prepared by our design partner. Alongside the installation, we merged and checked the drawings against the survey and the installed cabling. The final allocation uses 21 + 1 switch actuators, and every surveyed circuit has its own channel.

How the KNX system is built

UnitDevicesQty
Switch actuatorsMDT AMS-1216.03 (12 channels), AMS-0816.03, AKS-0216.0321 + 1 + 1
Heating, shading, dimmingMDT AKH-0800.03, JAL-0810M.02, AKD-0401.022 + 2 + 1
System devicesline coupler, logic module, DALI gateway (2 outputs), Modbus gateway, LogicMachine5
Power suppliesMDT STC-1280.01, one per line, on a UPS circuit2
Push buttonsTaster Light 55 and Taster Smart 86, all with a built-in temperature sensor25 + 2 + 7
Sensorsceiling presence, wall and outdoor motion, temperature/humidity, water leak sensors, weather station17 + 3 + 5 + 4 + 2 + 1
MeteringKNX energy meters (main supply, 2 EV chargers, heat-pump side), KNX water meters4 + 3
Gatewaysair conditioning (Intesis), ventilation unit (Zehnder ComfoConnect KNX C), heat pump (Zennio), gate (Hörmann)4

Push buttons and presence detectors also measure room temperature, so heating is controlled room by room. The colour-display Taster Smart 86 doubles as the room thermostat. Logic, visualisation on the touch panels and the Modbus side run on the LogicMachine.

What the house can do

  • Lighting: switched and DALI-dimmed circuits, presence and motion control, outdoor lights with motion sensors.
  • Heating: 15 underfloor circuits on 3 manifolds, with floor temperature sensors under heated finishes; the heat pump connects through a KNX gateway.
  • Shading: 14 blind motors with individual and central control; weather station data is available.
  • Ventilation: the heat-recovery unit is on KNX, so its levels can follow presence and humidity.
  • Safety: water leak sensors, door and gate status; the alarm and the CCTV remain separate systems.
  • Energy: main supply, heat-pump and EV charger metering; KNX limits the combined load of the two chargers (one active charger 32 A, two 25 A each) so the supply is never overloaded.

Low voltage: 11 systems in one design

Besides KNX, the low-voltage network is also our work: intrusion alarm (Paradox EVO192) with 20 smoke and heat detectors on its fire zones, 14 IP cameras with a network recorder, structured cabling in two racks (3 × 24-port patch panels), an IP door station with fingerprint reader, a Modbus link and the provider’s fibre entry. All systems are in one overview design, by backbone, with a PoE power budget.

Documentation handed over

  • Single-line diagrams of the main board and two sub-boards, with sizing.
  • Panel layout drawings with module allocation.
  • Cable book: 75 A3 pages, 214 cables; per box and per core, with KNX actuator and channel.
  • Low-voltage overview design with end points and the KNX bus budget.
  • Test programme for the initial verification: 134 final circuits, 94 circuit breakers, 43 RCDs.
  • The KNX project file and device list, with the open-items register.

What an electrical handover usually includes is described in our article on electrical as-built documentation.

Lessons learned

  • Channel allocation must match the real circuits. Without comparing drawing and survey, empty actuator channels and circuits without a channel would have remained.
  • Choose building-services gateways early: heat pump, ventilation unit and gate need space, power and cable in the board and at the device.
  • Load management is a sizing question: with two EV chargers and a heat pump, the supply is only sufficient if the system limits the combined load.
  • Documentation is part of the installation: in a house with 214 cables, troubleshooting and later extension are slow without a per-box cable book.

Related: KNX smart home · Smart home installation · KNX or wireless? · Loxone or KNX? · Electrical as-built documentation · Energy metering

Frequently asked questions

How many KNX devices does a family house need?

This passive house of about 165 m² has 129 KNX devices and 252 switched channels, because lighting, heating, shading, ventilation and metering all run on KNX. A simpler house needs a fraction of that; the count follows the number of controlled circuits.

Can a heat pump and a ventilation unit be connected to KNX?

Yes, through manufacturer gateways: here the heat pump uses a Zennio gateway and the Zehnder unit a ComfoConnect KNX C.

Can KNX manage EV charger load?

Yes. Here KNX limits the combined current of the two chargers: one active charger gets 32 A, two get 25 A each, so the supply is not overloaded.

What does the client receive at handover?

Single-line diagrams, panel layouts, a per-box cable book, the low-voltage design, the test reports and the KNX project file.

What does such a system cost?

Every house is different, so we work from an individual survey and quotation. Indicative price ranges are on our KNX smart home page.

Let’s talk about your project.

Tell us what you are planning and we will get back to you within a few days.

Get in touch

Cookie settings

Choose what you consent to. We remember your choice for 6 months; change it any time via “Cookie settings” in the footer.

Privacy notice